Project Insights
The residents were delighted with the outcome, particularly the building’s refreshed appearance. Since completion, the Building Management Committee has engaged Dukes to undertake further projects at Linea Apartments.
Project Value: Approx. $700,000
Duration: 6 months in 2025-2026
Status: Complete
Full external remedial and strata repainting works at Linea Apartments on Atchison Street, St Leonards. The 100-unit mixed-use high-rise was completed for the Building Management Committee, representing residential and commercial strata schemes, with RHM Consultants as superintendent. The project incorporated a carefully considered colour scheme developed by Lick Light + Colour.
Constructed in the early 2000s, the building features painted precast concrete panels. The scope included resealing all vertical and horizontal panel joints, render repairs to balcony slab edges, render bands and soffits, and concrete spalling repairs to columns and rooftop elements.
We also treated corroded steel on door frames, soffit framing, handrails, awning stays and carpark gates, investigated water penetration at the lift foyer glazing through spray testing and replaced missing fibre cement balcony screens.
The project also involved a full external repaint of the façades, balconies, soffits, parapets, awnings, doors and frames.
With so many different areas requiring attention, it was important to address the underlying defects prior to repainting to ensure longevity and protection against the weather. The building also needed a fresh, modern appearance that fit well within the St Leonards streetscape, all while keeping disruption to residents, commercial tenants and neighbours to a minimum.
We used rope access and boom lifts to carry out the work. As the balconies could not be reached through individual units, all façade and balcony works had to be completed externally.
The eastern side of the building also overhangs a neighbouring property’s swimming pool. Our team encapsulated this area during working hours to prevent debris and overspray from entering the water, then removed the protection each afternoon so residents could use the pool in the evenings.
Working on the façade of a fully occupied high-rise building presents its own challenges. We had to sequence the work around residents and commercial tenants, while also taking precautions around neighbouring properties, including the swimming pool.
The extent of the repairs couldn’t be confirmed until we gained access to the affected areas. Every render and concrete surface was hammer tested, with defects marked and opened up for inspection by RHM before repairs could begin.
There was also the issue of water ingress at the lift foyers. The source wasn’t immediately apparent, so spray testing was necessary to establish where the water was entering.
“With so many different areas requiring attention, it was important to address the underlying defects prior to repainting to ensure longevity and protection against the weather.”
The preparation and repair methods differed depending on the material involved:
The residents were delighted with the outcome, particularly the building’s refreshed appearance. Since completion, the Building Management Committee has engaged Dukes to undertake further projects at Linea Apartments.
Communication was coordinated between the Building Management Committee, the residential and commercial strata schemes, building management and the neighbouring property. We also worked closely with RHM Consultants throughout the project, with defects inspected at agreed stages before repairs proceeded. This ensured the owners had a clear understanding of the scope and any variations required.
Different coating systems were selected for the various surfaces across the building, with particular attention given to the demands of a high-rise environment:
The colour scheme developed by Lick Light + Colour was integral to the building’s transformation. Rather than simply repainting the existing colours, the new palette gave Linea Apartments a much more distinctive appearance.
Bottle Green was used at the base of the building, with Silver Jewel on the upper tower to give it a lighter feel. Dover White on the balcony bands and balustrades emphasised the horizontal lines, while Monument was chosen for the feature fin wall and street awnings.
The project covered a 100-unit mixed-use high-rise in St Leonards, Sydney. Works included concrete spalling and render repairs, replacement of failed joint sealants, corrosion treatment, investigation of water ingress and a complete external repaint of the building.
Dukes used rope access and boom lifts to complete all façade and balcony works externally, without entering individual apartments. Work was sequenced around residents and commercial tenants, with additional precautions taken to protect neighbouring properties.
Damaged concrete was removed back to sound material, and exposed reinforcement was cleaned before repairs were completed using the Sika MonoTop system. Unsound render was cut out and reinstated with polymer-modified render. RHM Consultants inspected defects and conducted hold-point inspections throughout the repair process.
The precast concrete façades and walls received Taubmans Armawall Primer followed by two coats of Taubmans Armawall Armashield Low Gloss. This flexible acrylic membrane provides weather protection while allowing moisture vapour to escape. Its dirt-shedding properties were particularly beneficial for a high-rise building where future repainting is a significant undertaking.
Lick Light + Colour developed the new colour scheme, which featured Bottle Green at street level, Silver Jewel on the upper tower and Dover White on balcony bands and balustrades. Monument was used on the feature fin wall and street awnings to complete the building’s updated appearance.